We turn renewable energy into AI compute infrastructure — deployable in 90 days, off-grid, without waiting on the interconnection permits that are frozen or banned across more than a dozen U.S. states.
The AI boom sent GPU compute demand soaring right as U.S. power grids started to strain. Communities and lawmakers responded clearly: slow down construction of traditional, grid-tied data centers.
Active cases: St. Charles (Missouri) banned new construction for a year. Lysander (New York) passed a 6-month moratorium in May 2026. DeKalb County (Georgia) postponed new developments until June 2026. Multiple Indiana counties have suspended projects, and one California city recently voted for a full ban.
NovoEdge doesn’t compete for the grid — we skip it entirely. Our model is 100% off-grid and powered by our own renewable energy — exactly the kind of infrastructure these moratoriums weren’t built to stop, since most of them target strain on the public power grid and municipal water use. New Hampshire actually moved the opposite direction this year, passing a law that makes it easier for data centers to self-supply power off-grid — validating exactly this approach.
A NovoEdge decentralized data center is built in four layers, each designed to operate independently from public infrastructure.
Solar, wind, tidal, or biogas, sized specifically for the site’s load.
At least 12 MWh of battery storage guaranteeing continuous 24/7 operation, regardless of solar or wind intermittency.
Prefabricated GPU compute units, deployable in 90 days, built to Tier 3 power standards.
GPU capacity sold to actively expanding AI compute buyers, with demand currently outpacing supply.
Solar infrastructure, BESS, and modular containers on a 20+ cuerda site, with scalable configurations from 1 to 7 containers under a single feasibility study.
A larger-scale project — 16 MW of capacity across 16 containers, with structured financing and a validated return model on an existing industrial site.
Development in partnership with a Dominican electrical and civil contractor, integrating solar generation, storage, and site infrastructure under a single development agreement.
Prefabricated modular containers, ready to operate in a fraction of the time of a traditional data center.
Models where the site owner doesn’t necessarily put up construction capital in cash.
Our modular infrastructure is engineered and supplied by a specialized data center technology partner, under an exclusive regional agreement.
NovoEdge manages the on-site project from start to finish, for the full term of the agreement.
NovoEdge develops, manages, and operates modular data centers powered by renewable energy in Puerto Rico and the Dominican Republic, designed to meet the growing demand for AI GPU compute — without relying on the traditional power grid.
We work with landowners, renewable energy generators, investors, and local contractors to turn energy and real estate assets into high-value compute infrastructure.
Our modular data centers, cooling systems, and compute infrastructure are engineered and supplied by a specialized data center technology partner under an exclusive regional agreement, built to Tier 3 power standards. NovoEdge manages every project on-site, from planning through operation.
Whether you generate renewable energy, own a strategic site, or are looking to diversify capital into AI infrastructure — let’s talk about how your project fits.